Changes

Headquarters

1,161 bytes added, 05:14, 11 May 2015
/* Future Facilities */ requirements
Ultimately, it is intended that the Society will again purchase a facility. It is unlikely that we will be able to obtain one that suits all of the expectations, but it may be possible over time to modify the facility or to replace it with a purpose-built structure. One would expect this last to be in the very distant future indeed, absent some truly amazing donations.
 
===Minimum Requirements===
 
* Work space for the Assistant Secretary/Production Editor, including room for a scanner and printer.
* Work space for the Assistant Treasurer/Cataloger, including space for books being processed.
:* The above would not have to be enclosed offices, but that would be a bonus.
* Work space for two volunteers, each with a computer terminal.
* A dedicated work area for printing, binding, and packaging, including storage space for supplies.
* Space to store back issues and reprints.
* Space for 26 4-drawer filing cabinets (some could probably be left in storage).
* Computer space for the firewall, servers, and battery backups (additional backup units in each work space).
* Space for four 6-foot storage cabinets.
* Room for a conference table to seat eight; this needed only occasionally, so space could be shared.
 
===Enhanced Requirements===
 
* Space for library stacks.
* Space for unprocessed library material.
* Space for map cabinet.
* Space for equipment storage (spare computers & printers).
* Space for a Rose Chapel (this could be used for the conference table).
* Space to store such museum items as may be retained.
----
6,164
edits